Skip to content
GE Frame 6B / PG6581B, equipment photograph, AMB-T003
AMB-T003 · Select a photograph to open its full size in a new tab.

Gas turbine · AMB-T003

GE Frame 6B / PG6581B

42 / 44 MW ISO, before remanufacture

Reference
AMB-T003
Equipment type
Gas turbine
Listed output
42 / 44 MW ISO, before remanufacture
Frequency
To be confirmed on enquiry
Scope note
Proposed remanufacture project

Availability, equipment condition, documentation and the final scope of supply are confirmed individually. Any configuration or conversion shown as “on request” needs project-specific confirmation.

Include reference AMB-T003 in your enquiry, or email lukas@ambgroupenergy.com.

Before you enquire

Confirm the fit for your project.

The listed rating is a starting point. Check the equipment configuration, electrical requirements and supply scope before assessing suitability.

  • Required capacity, quantity and intended application
  • Operating frequency, voltage and fuel requirements
  • Project destination and required timing
  • Documentation, condition and scope to be confirmed

The next step

Request the equipment details.

Share your requirements and the reference AMB-T003. AMB Group Energy will discuss the specification, configuration and commercial next steps directly with you.

kW and MW describe real power; 1 MW equals 1,000 kW. kVA describes apparent power and needs the applicable power factor to relate it to kW. Confirm whether a rating applies to one unit or a complete package.