Photographs on request
Gas turbine · AMB-T005
GE LM2500
21 MW nominal per package
- Reference
- AMB-T005
- Equipment type
- Gas turbine
- Listed output
- 21 MW nominal per package
- Frequency
- To be confirmed on enquiry
- Scope note
- Incomplete packages — approx. 70% / 15% complete
Availability, equipment condition, documentation and the final scope of supply are confirmed individually. Any configuration or conversion shown as “on request” needs project-specific confirmation.
Include reference AMB-T005 in your enquiry, or email lukas@ambgroupenergy.com.
Before you enquire
Confirm the fit for your project.
The listed rating is a starting point. Check the equipment configuration, electrical requirements and supply scope before assessing suitability.
- Required capacity, quantity and intended application
- Operating frequency, voltage and fuel requirements
- Project destination and required timing
- Documentation, condition and scope to be confirmed
The next step
Request the equipment details.
Share your requirements and the reference AMB-T005. AMB Group Energy will discuss the specification, configuration and commercial next steps directly with you.
kW and MW describe real power; 1 MW equals 1,000 kW. kVA describes apparent power and needs the applicable power factor to relate it to kW. Confirm whether a rating applies to one unit or a complete package.
