Skip to content
AMB-T005AMB GROUP ENERGY

Photographs on request

Gas turbine · AMB-T005

GE LM2500

21 MW nominal per package

Reference
AMB-T005
Equipment type
Gas turbine
Listed output
21 MW nominal per package
Frequency
To be confirmed on enquiry
Scope note
Incomplete packages — approx. 70% / 15% complete

Availability, equipment condition, documentation and the final scope of supply are confirmed individually. Any configuration or conversion shown as “on request” needs project-specific confirmation.

Include reference AMB-T005 in your enquiry, or email lukas@ambgroupenergy.com.

Before you enquire

Confirm the fit for your project.

The listed rating is a starting point. Check the equipment configuration, electrical requirements and supply scope before assessing suitability.

  • Required capacity, quantity and intended application
  • Operating frequency, voltage and fuel requirements
  • Project destination and required timing
  • Documentation, condition and scope to be confirmed

The next step

Request the equipment details.

Share your requirements and the reference AMB-T005. AMB Group Energy will discuss the specification, configuration and commercial next steps directly with you.

kW and MW describe real power; 1 MW equals 1,000 kW. kVA describes apparent power and needs the applicable power factor to relate it to kW. Confirm whether a rating applies to one unit or a complete package.